|
|
DOA (Part 21J.749) / POA (Part 21G): we provide the certified design of minor and major modifications or repairs (Change and Repairs) on a very large scope (Cabin, Avionics, Hydraulic Systems, Structure...). |
Cabin, Structure, Elec Certification
EXPERIENCE OF R&R CONSULTING IN MODIFICATIONS
Modifications of AS350 and EC135 for line surveillance
⦿ STC for Becker seat installation
⦿ Management of MoC supporting documentation:
MoC5 (EMI), MoC6 (in-flight vibration, etc.), MoC7 (functional tests), MoC1 (electrical and wiring)
⦿ Installation of position lights including a formation strobe light (including ground testing)
⦿ Modification of suspended personnel transport pods
⦿ Management of MoC supporting documentation:
MoC5 (EMI), MoC6 (in-flight vibration, etc.), MoC7 (functional tests), MoC1 (electrical and wiring)
⦿ Installation of position lights including a formation strobe light (including ground testing)
⦿ Modification of suspended personnel transport pods
⦿ Installation of FLIR turret
⦿ Installation of pedestal (cabinet/rack between front seats) with wiring routed to the rear
⦿ Mission equipment power supply
⦿ Development and installation of fully equipped mission console”
⦿ Installation of pedestal (cabinet/rack between front seats) with wiring routed to the rear
⦿ Mission equipment power supply
⦿ Development and installation of fully equipped mission console”
Certification of mission racks and antennas
CONSOLE, CABIN & EXTERIOR MODIFICATIONS EXPERIENCE
Cabin Certification
CONSOLE, CABIN & EXTERIOR MODIFICATIONS EXPERIENCE
Other Certification Projects
MOD AND REPAIR EXPERIENCES
|
External Liveries and Technical Markings
⦿ Certification Plans ⦿ 2D/3D Design ⦿ Compliance Demonstration ⦿ 21J Certification |
Landing Gears Bushings
⦿ Design and certification of all landing gear bushings for the A320 and A330/340 families ⦿ Laboratory endurance testing on our custom test bench ⦿ DO-160 testing ⦿ Over 600 PNs approved in the past 4 years ⦿ A350 bushings currently under development |